Support SCM by making a single or recurring donation.
ROADS AND TRAFFIC
Updated: 08:30 PM v2.5 Run Spr to Highland (330): 20 mins Highland to Run Spr (330): 20 mins Big Bear to Run Spr (18): 21 mins Run Spr to Big Bear (18): 21 mins Big Bear to Redlands (38): 66 mins Redlands to Big Bear (38): 65 mins Big Bear to Lucerne (18): 34 mins Lucerne to Big Bear (18): 35 mins =Light =Moderate =Heavy Traffic Road Conditions Page: Click Here
R1=2WD Vehicles must have M+S Tires, must carry chains R2=2WD Chains Required, 4WD must carry chains R3=Chains required on ALL vehicles!
RECENT TRAFFIC INCIDENTS AS OF: 08:45 PM
TODAY AT 08:25 PM (LAKE ARROWHEAD ) TRAFFIC HAZARD on EDGECLIFF DR / DIXIE (Details) TRAFFIC HAZARD-TRAFFIC HAZARD EDGECLIFF DR / DIXIE Incident Weather: 62 degrees with 44% humidity. Winds NNE at 1 mph. Precip: Clear Sky - 
DETAILED CHAINS RESTRICTIONS AS OF: 08:45 PM (Data obtained from Caltrans database) R1=2WD Vehicles must have M+S Tires, must carry chains R2=2WD Chains Required, 4WD must carry chains R3=Chains required on ALL vehicles! (List below created by Socalmountains.com custom software)
NO CHAIN RESTRICTIONS AT THIS TIME
CALTRANS ROAD WORK AS OF: 08:30 PM
ROAD WORK IN PROGRESS
UPCOMING ROAD WORK
SR-173 in Lake Arrowhead from Lake Arrowhead (Rainbow Dr) to Lake Arrowhead (Rainbow Dr) (At the 5390 foot level) IMPACTS: Right Shoulder ONE-WAY TRAFFIC due to ELECTRICAL WORK. From Wednesday Sep 23 at 9am to Wednesday Sep 23 at 3pm Work Status:UPCOMING
SR-18 in Running Springs from Running Springs (Running Springs School Rd) to Running Springs (Arrowbear Dr) (At the 6122 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to SHOULDER WORK. From Wednesday Sep 23 at 8am to Wednesday Sep 23 at 3pm Work Status:UPCOMING
SR-18 in Big Bear Lake from Big Bear Lake (Fox Farm Rd) to Big Bear Lake (Knight Ave) (At the 6794 foot level) IMPACTS: #1 Lane LANE CLOSURE due to GRINDING AND PAVING. From Wednesday Sep 23 at 5am to Wednesday Sep 23 at 7pm Work Status:UPCOMING
SR-18 in Big Bear Lake from Big Bear Lake (Fox Farm Rd) to Big Bear Lake (Fox Farm Rd) (At the 6794 foot level) IMPACTS: Left Shoulder, #1 Lane, #2 Lane, Right S ALTERNATING LANES due to STRIPING OPERATION. From Thursday Sep 24 at 9am to Thursday Sep 24 at 3pm Work Status:UPCOMING
SR-18 in Running Springs from Running Springs (Running Springs School Rd) to Running Springs (Arrowbear Dr) (At the 6122 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to SHOULDER WORK. From Thursday Sep 24 at 8am to Thursday Sep 24 at 3pm Work Status:UPCOMING
SR-18 in Running Springs from Running Springs (Arrowbear Dr) to Fawnskin (Route 38/N Shore Dr) (At the 6151 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to DRAINAGE WORK. From Wednesday Sep 23 at 7am to Wednesday Sep 23 at 2pm Work Status:UPCOMING
SR-18 in Running Springs from Running Springs (Arrowbear Dr) to Fawnskin (Route 38/N Shore Dr) (At the 6151 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to DRAINAGE WORK. From Thursday Sep 24 at 7am to Thursday Sep 24 at 2pm Work Status:UPCOMING
SR-189 in Lake Arrowhead from Lake Arrowhead (Blue Jay Cutof) to Lake Arrowhead (Blue Jay Post Office) (At the 5377 foot level) IMPACTS: ALTERNATING FULL CLOSUREALTERNATING TRAFFIC BREAK due to UTILITY WORK. From Thursday Sep 24 at 9am to Thursday Sep 24 at 3pm Work Status:UPCOMING
SR-189 in Lake Arrowhead from Lake Arrowhead (Route 173) to Lake Arrowhead (Route 173) (At the 5226 foot level) IMPACTS: #1 Lane, Right Shoulder ONE-WAY TRAFFIC due to ELECTRICAL WORK. From Thursday Sep 24 at 8am to Thursday Sep 24 at 3pm Work Status:UPCOMING
SR-330 in Running Springs from Running Springs (Route 18/Hilltop Blvd) to Running Springs (Route 18/Hilltop Blvd) (At the 6059 foot level) IMPACTS: #1 Lane, Right Shoulder ONE-WAY TRAFFIC due to PAVING OPERATION. From Wednesday Sep 23 at 7am to Wednesday Sep 23 at 5pm Work Status:UPCOMING
SR-38 in Big Bear City from Big Bear City (Division Dr) to Big Bear City (Stanfield Cutoff) (At the 6765 foot level) IMPACTS: Left Shoulder, #1 Lane, #2 Lane, Right S ALTERNATING LANES due to AC PAVING. From Wednesday Sep 23 at 8am to Wednesday Sep 23 at 4pm Work Status:UPCOMING
SR-38 in Mentone from Mentone (Ward Way) to Mentone (Julian Dr) (At the 2093 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to UTILITY WORK. From Wednesday Sep 23 at 9am to Wednesday Sep 23 at 3pm Work Status:UPCOMING
SR-38 in Mentone from Mentone (Ward Way) to Mentone (Julian Dr) (At the 2093 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to UTILITY WORK. From Thursday Sep 24 at 9am to Thursday Sep 24 at 3pm Work Status:UPCOMING
SR-38 in Mentone from Mentone (Bryant St) to Mentone (Bryant St) (At the 2667 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to CORE DRILLING. From Wednesday Sep 23 at 8am to Wednesday Sep 23 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Lugonia Ave) (At the 1374 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Thursday Sep 24 at 7am to Thursday Sep 24 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Lugonia Ave) (At the 1374 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Wednesday Sep 23 at 7am to Wednesday Sep 23 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1371 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Wednesday Sep 23 at 7am to Wednesday Sep 23 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1371 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Thursday Sep 24 at 7am to Thursday Sep 24 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1371 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Wednesday Sep 23 at 7am to Wednesday Sep 23 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Route 10) to Redlands (6th St) (At the 1371 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Thursday Sep 24 at 7am to Thursday Sep 24 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Route 10) to Redlands (6th St) (At the 1371 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Wednesday Sep 23 at 7am to Wednesday Sep 23 at 3pm Work Status:UPCOMING
SR-38 in Big Bear City from Big Bear City (Division Dr) to Big Bear City (Stanfield Cutoff) (At the 6765 foot level) IMPACTS: Left Shoulder, #1 Lane, #2 Lane, Right S ALTERNATING LANES due to AC PAVING. From Thursday Sep 24 at 8am to Thursday Sep 24 at 4pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1371 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Thursday Sep 24 at 7am to Thursday Sep 24 at 3pm Work Status:UPCOMING
CALTRANS SIGNBOARDS AS OF: 08:45 PM
Eastbound I-10 near RIVERSIDE CO (RIV 10 EB [024.00] Verbenia Cabazon (29))
CA-86 31 MIN CA-177 107 MIN
Northbound SR-111 near RIVERSIDE CO (RIV 111 NB [059.30] N/O Overture Rd (66))
CA-24320 MIN CA-6025 MIN
Eastbound SR-60 near RIVERSIDE CO (RIV 60 EB [008.69] RUBIDOUX BLVD (6))
CA-74 26 MIN I-10 33 MIN
Westbound SR-60 near RIVERSIDE CO (RIV 60 WB [004.94] PEDLEY (5))
LA CNTY 14 MIN
Westbound SR-62 near RIVERSIDE CO (RIV 62 WB [001.60] N/O Dillon Rd (67))
Don't change it TOO much though, Ben. This site has been our mainstay for decades as well! Although we had to start a new account a few years ago, with regulars such as Ⓒammy and LumbeⓇJill.
@CHP Arrowhead: 🍂🚶 Fall means more pedestrians! As daylight shortens, stay vigilant for people walking or biking, especially at dusk. September 22, 2026 at 12:00AM