Support SCM by making a single or recurring donation.
ROADS AND TRAFFIC
Updated: 07:00 AM v2.5 Run Spr to Highland (330): 18 mins Highland to Run Spr (330): 21 mins Big Bear to Run Spr (18): 20 mins Run Spr to Big Bear (18): 21 mins Big Bear to Redlands (38): 64 mins Redlands to Big Bear (38): 67 mins Big Bear to Lucerne (18): 34 mins Lucerne to Big Bear (18): 37 mins =Light =Moderate =Heavy Traffic Road Conditions Page: Click Here
 RUNNING SPRINGS TO HIGHLAND: 18 mins [0 min Delay]  HIGHLAND TO RUNNING SPRINGS: 21 mins [1 min Delay] ROAD OPEN NO CHAIN RESTRICTIONS
 RUNNING SPRINGS TO BIG BEAR: 21 mins [0 min Delay]  BIG BEAR TO RUNNING SPRINGS: 20 mins [0 min Delay] ROAD OPEN NO CHAIN RESTRICTIONS • ONE-WAY TRAFFIC SR-18 from Arrowbear Dr (Running Springs) to Route 38/N Shore Dr (Fawnskin) due to Drainage Work • ONE-WAY TRAFFIC SR-18 from Blackfoot Trail (Twin Peaks) to Rim High School (Lake Arrowhead) due to Grinding and Paving • ONE-WAY TRAFFIC SR-18 from Arrowhead Villa Rd (Skyforest) to Kuffel Canyon Rd (Skyforest) due to Grinding and Paving
 BIG BEAR TO REDLANDS: 64 mins [0 min Delay]  REDLANDS TO BIG BEAR: 67 mins [0 min Delay] ROAD OPEN NO CHAIN RESTRICTIONS • ONE-WAY TRAFFIC SR-38 from Route 10 (Redlands) to 6th St (Redlands) due to Roadway Excavation • LANE CLOSURE SR-38 from Colton Ave (Redlands) to Colton Ave (Redlands) due to Roadway Excavation • LANE CLOSURE SR-38 from Colton Ave (Redlands) to Colton Ave (Redlands) due to Roadway Excavation • ONE-WAY TRAFFIC SR-38 from Colton Ave (Redlands) to Lugonia Ave (Redlands) due to Roadway Excavation
 BIG BEAR TO LUCERNE VALLEY: 34 mins [0 min Delay]  LUCERNE VALLEY TO BIG BEAR: 37 mins [2 min Delay] ROAD OPEN NO CHAIN RESTRICTIONS
R1=2WD Vehicles must have M+S Tires, must carry chains R2=2WD Chains Required, 4WD must carry chains R3=Chains required on ALL vehicles!
RECENT TRAFFIC INCIDENTS AS OF: 07:00 AM
TODAY AT 05:45 AM (SAN BERNARDINO ) ACCIDENT NO INJURIES on HIGHWAY 330 S TO / I210 E (Details) TRAFFIC ACCIDENT WITH PROPERTY DAMAGE COLLISION-NO INJURY HIGHWAY 330 S TO / I210 E Incident Weather: 66 degrees with 69% humidity. Winds N at 1 mph. Precip: Clear Sky - 
TODAY AT 05:40 AM (LAKE ARROWHEAD ) CZP-ASSIST WITH CONSTRUCTION on CTIN CALTRANS BURNT MILL YARD (Details) CZP-ASSIST WITH CONSTRUCTION CTIN CALTRANS BURNT MILL YARD Incident Weather: 53 degrees with 56% humidity. Winds ESE at 1 mph. Precip: Clear Sky - 
DETAILED CHAINS RESTRICTIONS AS OF: 07:00 AM (Data obtained from Caltrans database) R1=2WD Vehicles must have M+S Tires, must carry chains R2=2WD Chains Required, 4WD must carry chains R3=Chains required on ALL vehicles! (List below created by Socalmountains.com custom software)
NO CHAIN RESTRICTIONS AT THIS TIME
CALTRANS ROAD WORK AS OF: 07:00 AM
ROAD WORK IN PROGRESS
SR-18 in Twin Peaks from Twin Peaks (Blackfoot Trail) to Lake Arrowhead (Rim High School) (At the 5662 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to GRINDING AND PAVING. From Wednesday Sep 16 at 7am to Wednesday Sep 16 at 3pm Work Status:ACTIVE
SR-18 in Running Springs from Running Springs (Arrowbear Dr) to Fawnskin (Route 38/N Shore Dr) (At the 6151 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to DRAINAGE WORK. From Wednesday Sep 16 at 7am to Wednesday Sep 16 at 2pm Work Status:ACTIVE
SR-18 in Skyforest from Skyforest (Arrowhead Villa Rd) to Skyforest (Kuffel Canyon Rd) (At the 5623 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to GRINDING AND PAVING. From Wednesday Sep 16 at 7am to Wednesday Sep 16 at 3pm Work Status:ACTIVE
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Lugonia Ave) (At the 1374 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Wednesday Sep 16 at 7am to Wednesday Sep 16 at 3pm Work Status:ACTIVE
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1371 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Wednesday Sep 16 at 7am to Wednesday Sep 16 at 3pm Work Status:ACTIVE
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1374 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Wednesday Sep 16 at 7am to Wednesday Sep 16 at 3pm Work Status:ACTIVE
SR-38 in Redlands from Redlands (Route 10) to Redlands (6th St) (At the 1371 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Wednesday Sep 16 at 7am to Wednesday Sep 16 at 3pm Work Status:ACTIVE
UPCOMING ROAD WORK
SR-138 in Cedarpines Park from Cedarpines Park (Camp Seeley) to Crestline (Lake Dr) (At the 4448 foot level) IMPACTS: #1 Lane, Right Shoulder, R T Pocket ONE-WAY TRAFFIC due to TREE WORK. From Thursday Sep 17 at 9am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-138 in Cedarpines Park from Cedarpines Park (Camp Seeley) to Crestline (Lake Dr) (At the 4448 foot level) IMPACTS: #1 Lane, Right Shoulder, R T Pocket ONE-WAY TRAFFIC due to TREE WORK. From Wednesday Sep 16 at 9am to Wednesday Sep 16 at 3pm Work Status:UPCOMING
SR-18 in Big Bear City from Big Bear City (Pan Springs Lane) to Big Bear City (Balcom Quarry Rd) (At the 6738 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to GUARDRAIL REPAIR. From Friday Sep 18 at 9am to Friday Sep 18 at 2pm Work Status:UPCOMING
SR-18 in Big Bear Lake from Big Bear Lake (Skyline Trail) to Big Bear Lake (Cove Rd) (At the 6784 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to AC PAVING. From Thursday Sep 17 at 9am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-18 in Big Bear Lake from Big Bear Lake (Tulip Ln) to Big Bear Lake (Cienega Rd) (At the 6794 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to AC PAVING. From Wednesday Sep 16 at 9am to Wednesday Sep 16 at 3pm Work Status:UPCOMING
SR-18 in Running Springs from Running Springs (Running Springs School Rd) to Running Springs (Arrowbear Dr) (At the 6122 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to HIGHWAY CONSTRUCTION. From Wednesday Sep 16 at 8am to Wednesday Sep 16 at 3pm Work Status:UPCOMING
SR-18 in Skyforest from Skyforest (Arrowhead Villa Rd) to Skyforest (Kuffel Canyon Rd) (At the 5623 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to GRINDING AND PAVING. From Thursday Sep 17 at 7am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-18 in Twin Peaks from Twin Peaks (Blackfoot Trail) to Lake Arrowhead (Rim High School) (At the 5662 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to GRINDING AND PAVING. From Thursday Sep 17 at 7am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-18 in Running Springs from Running Springs (Upper Boulder Dr) to Running Springs (Arrowbear Dr) (At the 6131 foot level) IMPACTS: #1 Lane, Right Shoulder ONE-WAY TRAFFIC due to UTILITY WORK. From Friday Sep 18 at 9am to Friday Sep 18 at 1pm Work Status:UPCOMING
SR-18 in Big Bear Lake from Big Bear Lake (Sandlewood Dr) to Big Bear Lake ((R) Paine Rd) (At the 6778 foot level) IMPACTS: #2 Lane, Right Shoulder LANE CLOSURE due to CURB/GUTTER/SIDEWALK WORK. From Wednesday Sep 16 at 9am to Wednesday Sep 16 at 3pm Work Status:UPCOMING
SR-18 in Big Bear Lake from Big Bear Lake (Sandlewood Dr) to Big Bear Lake ((R) Paine Rd) (At the 6778 foot level) IMPACTS: #2 Lane, Right Shoulder LANE CLOSURE due to CURB/GUTTER/SIDEWALK WORK. From Thursday Sep 17 at 9am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-18 in Big Bear Lake from Big Bear Lake (Sandlewood Dr) to Big Bear Lake ((R) Paine Rd) (At the 6778 foot level) IMPACTS: #2 Lane, Right Shoulder LANE CLOSURE due to CURB/GUTTER/SIDEWALK WORK. From Friday Sep 18 at 9am to Friday Sep 18 at 3pm Work Status:UPCOMING
SR-18 in Running Springs from Running Springs (Running Springs School Rd) to Running Springs (Arrowbear Dr) (At the 6122 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to HIGHWAY CONSTRUCTION. From Thursday Sep 17 at 8am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-18 in Running Springs from Running Springs (Arrowbear Dr) to Fawnskin (Route 38/N Shore Dr) (At the 6151 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to DRAINAGE WORK. From Thursday Sep 17 at 7am to Thursday Sep 17 at 2pm Work Status:UPCOMING
SR-18 in Running Springs from Running Springs (Arrowbear Dr) to Fawnskin (Route 38/N Shore Dr) (At the 6151 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to DRAINAGE WORK. From Friday Sep 18 at 7am to Friday Sep 18 at 1pm Work Status:UPCOMING
SR-330 in Running Springs from Running Springs (Live Oak Dr) to Running Springs (Live Oak Dr) (At the 5121 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to DRAINAGE CLEANING. From Thursday Sep 17 at 9am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-330 in Running Springs from Running Springs (East Fork City Creek) to Running Springs (Dollar Bill Curve) (At the 3786 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to DRAINAGE CLEANING. From Wednesday Sep 16 at 9am to Wednesday Sep 16 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Lugonia Ave) (At the 1374 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Thursday Sep 17 at 7am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-38 in Mentone from Mentone (Ward Way) to Mentone (Julian Dr) (At the 2093 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to UTILITY WORK. From Wednesday Sep 16 at 9am to Wednesday Sep 16 at 3pm Work Status:UPCOMING
SR-38 in Mentone from Mentone (Ward Way) to Mentone (Julian Dr) (At the 2093 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to UTILITY WORK. From Thursday Sep 17 at 9am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-38 in Mentone from Mentone (Ward Way) to Mentone (Julian Dr) (At the 2093 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to UTILITY WORK. From Friday Sep 18 at 9am to Friday Sep 18 at 1pm Work Status:UPCOMING
SR-38 in Big Bear City from Big Bear City (Division Dr) to Big Bear City (Stanfield Cutoff) (At the 6765 foot level) IMPACTS: Left Shoulder, #1 Lane, #2 Lane, Right S ALTERNATING LANES due to AC PAVING. From Wednesday Sep 16 at 8am to Wednesday Sep 16 at 4pm Work Status:UPCOMING
SR-38 in Big Bear City from Big Bear City (Balky Horse Canyon Rd) to Big Bear City (Zaca Rd) (At the 7693 foot level) IMPACTS: #1 Lane, Right Shoulder ONE-WAY TRAFFIC due to UTILITY WORK. From Wednesday Sep 16 at 9am to Wednesday Sep 16 at 3pm Work Status:UPCOMING
SR-38 in Big Bear City from Big Bear City (Division Dr) to Big Bear City (Stanfield Cutoff) (At the 6765 foot level) IMPACTS: Left Shoulder, #1 Lane, #2 Lane, Right S ALTERNATING LANES due to AC PAVING. From Thursday Sep 17 at 8am to Thursday Sep 17 at 4pm Work Status:UPCOMING
SR-38 in Big Bear City from Big Bear City (Division Dr) to Big Bear City (Stanfield Cutoff) (At the 6765 foot level) IMPACTS: Left Shoulder, #1 Lane, #2 Lane, Right S ALTERNATING LANES due to AC PAVING. From Friday Sep 18 at 8am to Friday Sep 18 at 4pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Route 10) to Redlands (6th St) (At the 1371 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Thursday Sep 17 at 7am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Route 10) to Redlands (6th St) (At the 1371 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Friday Sep 18 at 7am to Friday Sep 18 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1371 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Thursday Sep 17 at 7am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1371 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Friday Sep 18 at 7am to Friday Sep 18 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1374 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Thursday Sep 17 at 7am to Thursday Sep 17 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Colton Ave) (At the 1374 foot level) IMPACTS: #1 Lane LANE CLOSURE due to ROADWAY EXCAVATION. From Friday Sep 18 at 7am to Friday Sep 18 at 3pm Work Status:UPCOMING
SR-38 in Redlands from Redlands (Colton Ave) to Redlands (Lugonia Ave) (At the 1374 foot level) IMPACTS: #1 Lane ONE-WAY TRAFFIC due to ROADWAY EXCAVATION. From Friday Sep 18 at 7am to Friday Sep 18 at 3pm Work Status:UPCOMING
CALTRANS SIGNBOARDS AS OF: 07:00 AM
Chatbox
You must be logged in to post comments on this site - please either log in or if you are not registered click here to signup
From USFS: In recognition of Constitution Day, all San Bernardino National Forest locations that normally charge an entrance fee will offer free entry on Thursday, September 17 [Click Here] More Info: [Click Here] Created September 15, 2026 at 03:30PM
@SBCOUNTYFIRE SAN BERNARDINO (Final): #WalnutIC has declared forward rate of spread stopped on both spots. No damage to structures or reported injuries. Crews will remain on-scene for mop-up and complete extinguishment. [Click Here] More Info: [Click Here]